paving installation of a shed in Dierkow (June 2010)


producing a cobblestone foundation prior to installation of an equipment shed.
(Mr. Kagel and Mr. Koehn)
The lawn edging is done with Borden. The substructure we prepared with crushed stone and gravel.


installation of roof drainage for the garden shed.


door assembly for the shed.

total should be scheduled 2 business days for the installation of a supplied equipment store, a time frame.